The Wave

Theme
Sea Intake and Outfall Systems, Marine Geotechnics
Client
Orascom / Metito, UAE
Status
Ongoing
Scope Of Work

The Water Treatment and Transportation Facilities part of this Project includes the facilities located at Mirfa. The Mirfa Cluster is situated about 100 km south-west of the City of Abu Dhabi, UAE. The new Treatment Facilities shall deliver a net water capacity of 115 MIGD and the new transportation facilities shall have the capacity to deliver treated seawater to two (2) separate water delivery points (Bab and Bu Hasa). Therefore, Seawater Intake and Outfall facility is required for the treatment facility.

The main elements of ADEC marine design scope include:

PHASE 1: Early Works
PHASE 2: Detailed Engineering Works
PHASE 3: Support during the procurement phase

Detailed Design of Intake and Outfall Structure:

  • Open Seawater Intake
  • Emergency Overflow to the shore
  • Effluent Discharge Diffusers